Hidd Al Saadiyat

The project is located on the northeastern tip of Saadiyat Island in Abu Dhabi. It is an island intended to be landscaped with a private desert forest and populated with wildlife. 

The development comprises a significant residential component, which has been designed by Naga and Infrastructure and site works including coastal protection works designed by AECOM. The marine components included a 110-berth marina with 360m of floating concrete breakwater pontoons, 340m of precast concrete gravity block quay walls, 100,000 m3 of dredging up to 4m deep, 630m of concrete pontoons, a 10m wide slipway and a refueling berth.

Why we have chosen this project?

MCa Associates is supporting LEAD Development by providing design services for the marina. We are also carrying out the supervision of the construction.

MCa Associates’ Scope

  • Marine advice
  • Design of marina and associated elements
  • Supervision

Location

Saadiyat Island, Abu Dhabi

Client

Saadiyat Development and Investment Company (SDIC)

Team

LEAD
MCa Associates